Nobody wants an extension. They want the room at the end of it.

So we spend the first three weeks on drawings, dates and a fixed price — and the rest of it out of your way.

Why most builds go wrong before anyone lifts a shovel

In twenty years of rear extensions we have never seen a job overrun because someone laid bricks slowly. It overruns because a steel was ordered late, because the structural calculations came back needing a bigger pad foundation, or because nobody asked where the boiler flue was going until week six.

That is the whole of our method. We do the boring, unglamorous sequencing work up front, in writing, and we charge for it as a separate pre-construction stage so you are not paying for guesses.

What a fixed price from us actually includes

If it is not on the schedule of works, it is not in the price — and we would rather argue about that in week zero than week twelve.

What it does not include, honestly

Kitchens, bathroom sanitaryware, flooring and decoration are carried as provisional sums against a budget you set. You buy what you like; we fit it. If you underspend, you get the difference back on the final account.

How a build runs

Five stages, and you always know which one you are in.

  1. Site visit and budget range

    Ninety minutes, free, and you get an honest range on the day. If your budget and the job do not meet, we say so then.

  2. Pre-construction, 3–4 weeks

    Engineer’s calcs, building control submission, party wall notices, and a schedule of works line by line. Charged at £1,850, credited back if you proceed.

  3. Fixed price and dates

    One number, one start date, one completion date, and a payment schedule tied to stages rather than the calendar.

  4. On site

    Site manager on your job daily, a photo update every Friday, and a fortnightly 20-minute call whether or not anything is wrong.

  5. Snagging and handover

    You write the snag list, not us. Ten-year structural warranty and all certificates handed over in one folder.

A typical 4m rear extension, week by week

  1. Weeks 1–2

    Groundworks

    Site set-up, protection, dig and inspect foundations with building control.

  2. Week 3

    Concrete and drainage

    Foundations poured, existing drain runs diverted and re-inspected.

  3. Weeks 4–6

    Brick and block to plate

    Cavity walls up, insulation in, wall plate levelled.

  4. Week 7

    Steels and structural opening

    The noisy week. Steels craned in, the existing rear wall opened up, props out.

  5. Weeks 8–9

    Roof and watertight

    Joists, warm-deck insulation, single-ply membrane, rooflights in. You get your garden back.

  6. Weeks 10–12

    First fix and plaster

    Electrics, plumbing, underfloor heating, then plasterboard and skim.

  7. Weeks 13–14

    Second fix and snagging

    Doors, sockets, screed finish, decoration, and your snag list.

Where we stand

148

Extensions completed

96%

Finished on the contract date

10 yr

Structural warranty

2

Concurrent jobs per manager

Who runs your job

Nadia Oyelaran

Nadia Oyelaran

Director & estimator

Prices every job personally. Ex-quantity surveyor, so the schedule of works is unusually specific.

Frank Ilyich

Frank Ilyich

Site manager

Twenty-two years on the tools. Runs two jobs at a time and no more, deliberately.

Sam Whitcombe

Sam Whitcombe

Site manager

Loft conversions and structural openings. Sends the Friday photo update at 4pm sharp.

Notes from site

Party wall notices: the six weeks nobody budgets for
Planning4 March

Party wall notices: the six weeks nobody budgets for

If your neighbour dissents you need a surveyor, and a surveyor needs time. Serve early and it costs you nothing.

Why your engineer wants a bigger foundation than your builder guessed
Groundworks19 February

Why your engineer wants a bigger foundation than your builder guessed

Clay shrinkage, tree roots and NHBC depth tables, explained without the jargon.

Rooflights: the one spec decision worth spending on
Spec30 January

Rooflights: the one spec decision worth spending on

Thermal break, not glass area, is what stops the condensation you will otherwise live with.

The questions we get every week

Do we have to move out?

For a rear extension, usually not — the disruptive part is the week the steels go in and the rear wall opens up. For a whole-house renovation, yes, and we will tell you that at the first visit rather than the fourth.

What happens if you find something unexpected?

We stop, photograph it, price the variation and get it signed before we carry on. Nothing lands on the final account that you have not agreed in writing first.

Are you insured and accredited?

£10m public liability, FMB members since 2011, and every electrician and gas engineer on site is NICEIC or Gas Safe registered in their own right. Certificates go in the handover folder.

How far do you travel?

Barnet, Haringey, Enfield and Camden. Outside that we would be sending vans through the North Circular twice a day and charging you for it.

Request a quote

The first site visit is free and takes about ninety minutes. Bring your drawings if you have them, and your budget if you have one.