Party wall notices: the six weeks nobody budgets for
If your neighbour dissents you need a surveyor, and a surveyor needs time. Serve early and it costs you nothing.
Main contractor · North London · est. 2004
So we spend the first three weeks on drawings, dates and a fixed price — and the rest of it out of your way.
In twenty years of rear extensions we have never seen a job overrun because someone laid bricks slowly. It overruns because a steel was ordered late, because the structural calculations came back needing a bigger pad foundation, or because nobody asked where the boiler flue was going until week six.
That is the whole of our method. We do the boring, unglamorous sequencing work up front, in writing, and we charge for it as a separate pre-construction stage so you are not paying for guesses.
If it is not on the schedule of works, it is not in the price — and we would rather argue about that in week zero than week twelve.
Kitchens, bathroom sanitaryware, flooring and decoration are carried as provisional sums against a budget you set. You buy what you like; we fit it. If you underspend, you get the difference back on the final account.
Five stages, and you always know which one you are in.
Ninety minutes, free, and you get an honest range on the day. If your budget and the job do not meet, we say so then.
Engineer’s calcs, building control submission, party wall notices, and a schedule of works line by line. Charged at £1,850, credited back if you proceed.
One number, one start date, one completion date, and a payment schedule tied to stages rather than the calendar.
Site manager on your job daily, a photo update every Friday, and a fortnightly 20-minute call whether or not anything is wrong.
You write the snag list, not us. Ten-year structural warranty and all certificates handed over in one folder.
Site set-up, protection, dig and inspect foundations with building control.
Foundations poured, existing drain runs diverted and re-inspected.
Cavity walls up, insulation in, wall plate levelled.
The noisy week. Steels craned in, the existing rear wall opened up, props out.
Joists, warm-deck insulation, single-ply membrane, rooflights in. You get your garden back.
Electrics, plumbing, underfloor heating, then plasterboard and skim.
Doors, sockets, screed finish, decoration, and your snag list.
Extensions completed
Finished on the contract date
Structural warranty
Concurrent jobs per manager
Nadia Oyelaran
Director & estimator
Prices every job personally. Ex-quantity surveyor, so the schedule of works is unusually specific.
Frank Ilyich
Site manager
Twenty-two years on the tools. Runs two jobs at a time and no more, deliberately.
Sam Whitcombe
Site manager
Loft conversions and structural openings. Sends the Friday photo update at 4pm sharp.
If your neighbour dissents you need a surveyor, and a surveyor needs time. Serve early and it costs you nothing.
Clay shrinkage, tree roots and NHBC depth tables, explained without the jargon.
Thermal break, not glass area, is what stops the condensation you will otherwise live with.
For a rear extension, usually not — the disruptive part is the week the steels go in and the rear wall opens up. For a whole-house renovation, yes, and we will tell you that at the first visit rather than the fourth.
We stop, photograph it, price the variation and get it signed before we carry on. Nothing lands on the final account that you have not agreed in writing first.
£10m public liability, FMB members since 2011, and every electrician and gas engineer on site is NICEIC or Gas Safe registered in their own right. Certificates go in the handover folder.
Barnet, Haringey, Enfield and Camden. Outside that we would be sending vans through the North Circular twice a day and charging you for it.
The first site visit is free and takes about ninety minutes. Bring your drawings if you have them, and your budget if you have one.